ResourcesCompany Update

Horizon Gold (ASX: HRN) Hits 42m at 2.76g/t at Kingfisher as Gum Creek resource growth gathers momentum

Horizon Gold’s latest Kingfisher drilling could extend the resource model by about 90 metres, with further results also expanding mineralisation at Psi, Hawk and Melbourne Bitter.

HRNHORIZON GOLD LIMITEDResources3 min read

Xinfb
[ASX: HRN] HORIZON GOLD LIMITED a reverse-circulation drill rig operating beside an established open pit in the arid Mid-West region of Western

Listen to article

0:00 / 3:19

Horizon Gold has intersected broad zones of high-grade gold mineralisation at its wholly owned Gum Creek Gold Project in Western Australia, reinforcing the potential to expand its 2.30-million-ounce resource base as the company advances plans for a major new gold mining operation.

Drilling at the Kingfisher deposit returned a standout intersection of 42 metres grading 2.76 grams per tonne gold from 144 metres, including 7 metres at 11.75 grams per tonne. A separate hole intersected 10 metres at 10.79 grams per tonne from 51 metres, including 7 metres at 15.21 grams per tonne.

The combination of broad mineralised intervals and higher-grade zones is encouraging for Horizon as it seeks to expand the project's resource inventory and improve geological confidence ahead of future mine planning.

Kingfisher emerges as a resource growth opportunity

Horizon completed 14 reverse-circulation holes totalling 2,361 metres at Kingfisher, targeting extensions immediately north of the existing resource model.

The company said drilling confirmed continuity of mineralisation, with the potential to extend the resource model by approximately 90 metres and increase the proportion of higher-confidence indicated resources within the deposit’s northern section.

Additional intersections included 8 metres at 4.53 grams per tonne from 41 metres and 14 metres at 2.47 grams per tonne from 165 metres. Mineralisation remains open in multiple directions, providing further exploration opportunities.

Kingfisher currently hosts a combined mineral resource of 192,400 ounces, comprising 78,900 ounces in open-cut resources and 113,500 ounces underground.

Horizon expects to incorporate the latest drilling into a revised resource estimate in early 2027, ahead of further exploration.

The geometry of the mineralisation is also encouraging, with Horizon estimating true widths at approximately 91% of the reported downhole intersections for primary mineralisation at Kingfisher.

Exploration success extends beyond Kingfisher

The latest drilling campaign has also delivered encouraging results at the Psi, Hawk and Melbourne Bitter deposits, highlighting the potential for resource growth across multiple areas of the broader Gum Creek project.

At Psi, drilling extended a steeply south-plunging gold shoot beneath the existing pit, with mineralisation now defined over more than 250 metres down-plunge.

The deepest hole returned 20 metres at 2.83 grams per tonne from 230 metres, including 11 metres at 4.25 grams per tonne. Notably, the intersection extended to the end of the hole, providing a compelling target for deeper exploration.

At Hawk, drilling returned 2 metres at 14.78 grams per tonne from 35 metres and 6 metres at 3.33 grams per tonne from 166 metres, further defining a steeply plunging high-grade gold shoot.

Melbourne Bitter delivered extensions approximately 50 metres south of the existing resource model, including 21 metres at 1.17 grams per tonne from 34 metres and 9 metres at 1.92 grams per tonne from 86 metres.

While drilling along the southernmost lines encountered only near-surface mineralisation, Horizon believes the deposit may be offset towards the south-west, presenting an additional exploration target that requires further testing.

Building scale around a proposed 88,000-ounce annual operation

The exploration results come at an important stage in Gum Creek’s development, with Horizon already establishing the technical and economic foundations for a substantial Western Australian gold operation.

The project's July 2026 definitive feasibility study outlined a 2.4-million-tonne-per-annum processing operation targeting average annual production of 88,000 ounces over an initial 10-year mine life.

Underpinned by a maiden ore reserve of 728,000 ounces, the proposed development carries estimated initial capital expenditure of A$350 million and all-in sustaining costs of A$2,995 an ounce.

Further resource growth could provide Horizon with greater flexibility in mine scheduling, opportunities to enhance the production profile and the potential to extend Gum Creek’s operational life beyond the initial 10-year development plan.

Further catalysts on the horizon

Horizon is maintaining exploration momentum across Gum Creek, with follow-up reverse-circulation and diamond drilling planned at Kingfisher, Psi, Hawk and Melbourne Bitter.

Resource-extension drilling has also been completed at Howards, while exploration has recently commenced at Kingston Town.

With an established multimillion-ounce resource, a completed definitive feasibility study and multiple deposits demonstrating potential for further expansion, Horizon enters 2027 with a series of resource updates and exploration results capable of further defining Gum Creek’s development opportunity.

Latest HORIZON GOLD LIMITED ASX Announcements

View complete HRN announcement history